Lifting and installation plant hire field guide
CONTROL THE LIFT PATH

Lifting and installation

A lift is the load, radius, ground, rigging, access and schedule considered together. Define the heaviest and furthest lift, then test crane setup, exclusion zones and transport before discussing availability.

Read the whole workface.

Lifting and installation covers everything from placing an air-conditioning unit on a roof to erecting bridge beams. The common thread is that the load, the radius and the ground under the crane must be known before the equipment is chosen.

For short, repeated lifts on firm ground, a Franna or telehandler may be fastest. For heavier loads, lifts over obstacles or long radius, an all-terrain slewing crane is normal. Inside buildings or through doorways, a mini crane or spider crane may be the only option.

Allow for rigging, dogging, traffic control, permits and lift planning in the brief. Critical or complex lifts need a documented lift plan reviewed by competent people.

Machines most often involved: mobile crane hire, franna crane hire, mini crane hire, crawler crane hire, telehandler hire, rigging equipment hire.

FIELD SIGNAL / 01Load data
FIELD SIGNAL / 02Maximum radius
FIELD SIGNAL / 03Ground bearing
FIELD SIGNAL / 04Rigging and permits
ASK BEFORE ALLOCATION

Three questions that expose the gaps.

  1. Is the load weight verified?
  2. Where can the crane establish?
  3. Who controls the lift plan?
FIELD FAQ

Lifting and installation: questions

What information does a crane company need?
The load weight and dimensions, pick and set-down locations, radius, height, site address, access and ground conditions, and the date and duration.
Franna crane or slewing crane?
A Franna suits pick-and-carry work on firm ground. A slewing crane is needed for longer radius, lifts over structures and heavier loads.
Who is responsible for the lift plan?
Responsibility is shared: the crane supplier plans the crane setup, and the principal contractor controls site interfaces. Agree who prepares and approves the plan before the crane arrives.