Start with what must happen.
Translate the job into equipment families, supporting services and better questions. These routes are designed for people who know the outcome before they know the plant name.
Bulk earthworks
Bulk earthworks are a production system: excavators, dozers, loaders, haul units, graders, water and compaction all need to cycle at compatible rates. Start with material type, cut-to-fill balance and haul distance before choosing machine sizes.
OPEN JOB PLAYBOOK →02 / OPEN · PROTECT · REINSTATETrenching and utilities
Utility work combines excavation with locating, shoring, lifting, pumping and reinstatement. The right plant choice is often governed by corridor width, live services and public access rather than bucket capacity alone.
OPEN JOB PLAYBOOK →03 / CONTROL THE LIFT PATHLifting and installation
A lift is the load, radius, ground, rigging, access and schedule considered together. Define the heaviest and furthest lift, then test crane setup, exclusion zones and transport before discussing availability.
OPEN JOB PLAYBOOK →04 / BUILD THE CORRIDORRoad building
Road crews need repeatable passes and predictable support across a moving workfront. Match graders, rollers, water carts and paving support to material layers, width, moisture and test requirements.
OPEN JOB PLAYBOOK →05 / MAKE THE GROUND LEGIBLESite clearing
Clearing is not simply pushing vegetation aside. Survey controls, retained trees, weeds, topsoil, disposal and fire conditions shape the fleet and sequence needed to open the site responsibly.
OPEN JOB PLAYBOOK →06 / SEPARATE BEFORE YOU MOVEDemolition and remediation
Demolition plant must suit the structure, materials, reach and waste stream. Attachments, dust suppression, screening and transport are part of the selection—not afterthoughts.
OPEN JOB PLAYBOOK →07 / FROM FORMATION TO POURConcrete and foundations
Foundation work connects excavation, drilling, lifting, pumping, access and spoil handling. Programme the handoffs so plant does not compete for the same narrow work zone.
OPEN JOB PLAYBOOK →08 / CONTROL THE WATERDrainage and dewatering
Water changes production, stability and environmental risk. Define inflow, head, solids and discharge conditions so pumping equipment and backup capacity match the consequence of failure.
OPEN JOB PLAYBOOK →09 / EVERY HOUR HAS A JOBShutdown maintenance
Shutdowns compress access, lifting, power and labour into a fixed window. Equipment readiness, inductions, standby arrangements and shared work zones should be closed before the plant enters site.
OPEN JOB PLAYBOOK →10 / PRACTICAL PLANT FOR REGIONAL WORKFarm, water and property works
Farm dams, tracks, clearing, drainage and property improvement often depend on travel distance, changing ground and owner-operated logistics. Define the outcome and access before comparing hourly rates.
OPEN JOB PLAYBOOK →