Bridge works plant plan plant hire field guide
PROJECT PLAYBOOK 05

Bridge works plant plan

Bridge work combines constrained access, heavy lifts, water interfaces and traffic or rail possessions. Every major plant position should be tested against later stages.

Read the whole workface.

Bridges combine piling, heavy lifting, concrete and work over water or traffic. Crane selection and positioning are often the critical decisions.

Crawler and large all-terrain cranes install beams; piling rigs build foundations; barges or temporary platforms may support work over water.

Temporary works and crane pads must be designed for each stage.

Machines most often involved: crawler crane hire, mobile crane hire, rigging equipment hire, excavator hire, pump hire.

FIELD SIGNAL / 01Crane pads
FIELD SIGNAL / 02Water access
FIELD SIGNAL / 03Possessions
FIELD SIGNAL / 04Temporary works
ASK BEFORE ALLOCATION

Three questions that expose the gaps.

  1. Who certifies setup areas?
  2. What changes with water level?
  3. Which lift is critical?
FIELD FAQ

Bridge works plant plan: questions

What cranes are used for bridge beams?
Large all-terrain or crawler cranes, sometimes in tandem.
What are temporary works?
Structures such as crane pads and falsework that support construction but are not part of the finished bridge.
Why are road or rail possessions important?
Many lifts can only occur during closures, which fixes the schedule.