Warehouse build plant plan plant hire field guide
PROJECT PLAYBOOK 02

Warehouse build plant plan

Large slabs and structures concentrate access, lifting and material handling. Early ground preparation gives way to repetitive vertical and fit-out movements.

Read the whole workface.

Warehouses start with large earthworks pads and progress to tilt-up or precast panels, steel roof structures, slabs and fit-out.

Pad works use dozers, graders, rollers and water carts. Structural stages need mobile cranes, Frannas, boom lifts and telehandlers. Fit-out brings scissor lifts, forklifts and indoor-rated equipment.

Crane access and slab protection are key considerations as the building closes in.

Machines most often involved: mobile crane hire, franna crane hire, boom lift hire, scissor lift hire, telehandler hire, roller hire.

FIELD SIGNAL / 01Pad preparation
FIELD SIGNAL / 02Structural lifts
FIELD SIGNAL / 03Slab loading
FIELD SIGNAL / 04Internal access
ASK BEFORE ALLOCATION

Three questions that expose the gaps.

  1. Where are loading zones?
  2. When does access close?
  3. Which plant must transition indoors?
FIELD FAQ

Warehouse build plant plan: questions

What cranes are used for tilt-up panels?
Mid to large all-terrain cranes, sized for panel weight and radius.
What access equipment is used in warehouses?
Boom lifts during structure and roofing; scissor lifts during fit-out.
Can plant work on a new slab?
Only within the slab's design loading and with protection against damage.