Lifting and Rigging Equipment Hire
Rigging must suit load geometry, lifting points, capacity, environment and planned method. This page helps turn a broad equipment label into a supplier-ready brief.

Specify the result, not just the machine.
Rigging must suit load geometry, lifting points, capacity, environment and planned method. Begin with quantities, materials, dimensions, production target and work sequence. Then share ground, gradients, overhead or underground hazards, access width and the room available to establish and operate.
Inspection currency, engineered lifts, communication and compatibility should be verified. Ask which exact unit is proposed, its current location and which attachments are included. Confirm whether transport, operator, fuel, minimum hours, standby and cleaning are included or separate.
A strong comparison aligns every supplier to the same scope. Directory categories are broad discovery routes; equipment, availability and service coverage must be verified directly for your dates and location.
Put these facts in every enquiry.
- Site address, dates, shifts and expected duration.
- Work outcome, quantity, material and site constraints.
- Operator model, attachments and documentation required.
- Mobilisation origin, full rate basis and breakdown pathway.