Road rehabilitation plant plan plant hire field guide
PROJECT PLAYBOOK 03

Road rehabilitation plant plan

Rehabilitation work is governed by possessions, traffic staging and rapid handback. Plant reliability and movement between work zones matter as much as peak output.

Read the whole workface.

Road rehabilitation replaces or strengthens existing pavements while keeping traffic moving. Work happens in short possessions, often at night.

Profilers, stabilisers, graders, rollers, water carts and tippers are typical, supported by traffic control and lighting.

Everything must be finished and safe before the road reopens.

Machines most often involved: grader hire, roller hire, water truck and water cart hire, tipper truck hire, traffic control equipment hire, lighting tower hire.

FIELD SIGNAL / 01Possession length
FIELD SIGNAL / 02Material removal
FIELD SIGNAL / 03Layer sequence
FIELD SIGNAL / 04Handback testing
ASK BEFORE ALLOCATION

Three questions that expose the gaps.

  1. What must reopen each shift?
  2. Where can equipment wait?
  3. How is weather managed?
FIELD FAQ

Road rehabilitation plant plan: questions

Why is road rehabilitation done at night?
To reduce traffic disruption on busy roads.
What is pavement stabilisation?
Mixing binder such as cement or lime into the existing pavement to strengthen it.
What plant is needed for road rehab?
Profilers, stabilisers, graders, rollers, water carts, tippers, traffic control and lighting.