Inductions and documentation plant hire field guide
CLEAR THE PAPERWORK BEFORE THE FLOAT

Inductions and documentation

Licences, SWMS, inspections, registrations and site requirements should be checked before transport is released.

Read the whole workface.

Equipment and operators are often turned away at the gate because paperwork is incomplete. Checking documentation before transport is released avoids wasted mobilisation.

Common requirements include operator licences and competencies, plant risk assessments, service and inspection records, registration, insurance and site-specific modifications.

Agree who reviews the documents and the deadline for submission.

Machines most often involved: mobile crane hire, boom lift hire, forklift hire.

FIELD SIGNAL / 01Operator evidence
FIELD SIGNAL / 02Plant records
FIELD SIGNAL / 03Site specification
FIELD SIGNAL / 04Submission deadline
ASK BEFORE ALLOCATION

Three questions that expose the gaps.

  1. Who reviews documents?
  2. Are originals required?
  3. What site modifications apply?
FIELD FAQ

Inductions and documentation: questions

What documents do hired machines need?
Commonly plant risk assessments, service records, registration, inspection certificates and operator competencies.
What is a SWMS?
A safe work method statement, required for high-risk construction work in Australia.
Who inducts the operator?
The site, usually through its induction process before work starts.