Mobilising heavy equipment

Heavy movements combine machine dimensions, carrier availability, permits, escorts, bridge limits, delivery windows and the last kilometre.

Read the whole workface.

Moving heavy plant is a transport project of its own. Machine mass, height and width determine the trailer, permit class and route.

Oversize or over-mass loads may need permits, pilots, escorts or travel-time restrictions. Bridges, overhead wires and tight turns on the final approach can force a different route.

Give the transport company accurate machine details, delivery windows and a safe unloading area.

Machines most often involved: low loader and float hire, dozer hire, crawler crane hire, excavator hire.

FIELD SIGNAL / 01Transport dimensions
FIELD SIGNAL / 02Permit class
FIELD SIGNAL / 03Route survey
FIELD SIGNAL / 04Unload area
ASK BEFORE ALLOCATION

Three questions that expose the gaps.

  1. Who books permits?
  2. Is the route confirmed?
  3. Can the site receive the float?
FIELD FAQ

Mobilising heavy equipment: questions

What makes a load oversize?
Exceeding standard width, height, length or mass limits for the road. Limits and permit rules vary by state.
Who arranges transport permits?
Usually the transport operator, but confirm responsibility in writing.
How long do permits take?
From same-day to several weeks depending on the load, route and state.