DETAILS REQUIRE DIRECT CONFIRMATION
Twotrax Earthmoving
Prepare a site-information pack for Twotrax Earthmoving. Use the published contact routes below to discuss the workfront, access constraints and the details still to establish.

Walk the site before you ask for a machine.
Prepare a small reconnaissance pack for Twotrax Earthmoving: a sketch of the route into the site, a few labelled photographs and a list of things you have not yet measured. The purpose is to make the difficult parts visible before anyone proposes equipment.
Start where the delivery vehicle would stop and follow the path to the actual task. A wide entrance can hide a narrow turn further inside. Record the tightest points along the whole route, not just the feature that is easiest to photograph.
Keep observations and conclusions separate. “The opening measures this wide” is an observation; “the machine will fit” is a conclusion that still depends on its configuration and how it will be moved. Ask the supplier which further dimensions or site details it needs.
For the earthmoving conversation
Show where material starts, where it is meant to finish and the route between those points. Describe the material and the working space available. Note any uncertainty about site conditions for the responsible project team to resolve before work is planned.
Show context, then detail.
- Approach: show the entrance and the space available before the gate.
- Restriction: show the narrowest or most awkward section, with measured dimensions written separately.
- Work position: show the task and the surrounding space from a useful viewpoint.
- Exit: show where the equipment will turn, leave or wait for collection.
Date every observation
Give photos a location and date. Explain the direction of view and identify temporary items that may move. Avoid including people or neighbouring property details that are not needed for the enquiry.
Keep an unknowns list
Mark estimated dimensions and unconfirmed conditions explicitly. Ask Twotrax Earthmoving which gaps prevent it from proposing an option and who should supply the missing information.
Check the site has not changed
A new delivery, excavation or temporary barrier can invalidate an earlier picture. Recheck the route before confirming arrangements and send an updated pack when the workfront changes.